Brokers sell plots. We do homework.

This is the intelligence layer behind everything on this site — what we produce, how often, and the current state of the ground. The full output lands in the community first.

WEEKLY

AI research digest

Every Dholera development that matters — announcements, filings, credible press — compiled by AI, verified against sources by humans, delivered in plain language. No noise, no forwarded hype.

MONTHLY

Satellite progress notes

Construction doesn't lie, and neither does open satellite imagery. We track visible progress on the fab, the airport, the road grid and the activation area — pace, not promises.

AS PUBLISHED

Plain-language filings

TP-scheme notifications, development-plan amendments, allotment notices — translated from bureaucratese into what it means for someone who owns (or wants to own) land there.

Ground truth

Infrastructure tracker.

The current, sourced status of every major piece. Statuses mean what they say — planned is a target, operational is open today.

AssetStatusThe factsSource
Ahmedabad–Dholera ExpresswayOperationalThe 109 km Ahmedabad–Dholera Expressway — a four-lane, access-controlled corridor expandable to eight lanes — was inaugurated on 31 March 2026.Wikipedia, 2026
Activation Area trunk infrastructureOperationalA 22.5 sq km Activation Area with plug-and-play trunk infrastructure — sanctioned at ₹4,400 Cr by the DMIC Trust — is now over 95% complete, and has already drawn industrial allotments including Tata Power Solar, ReNew, Hitachi Hi-Rel, and Torrent Gas.GIDB, Government of Gujarat, 2026
Dholera Solar Park (phased)OperationalDholera Solar Park carries Ultra-Mega status with a 5 GW target by 2030. Over 1,200 MW was already commissioned by 2025, including Tata Power's 300 MW Phase 1 — online since April 2022 — which uses India's largest single-axis solar tracker system.Global Energy Monitor, 2026
Dholera International AirportUnder constructionDholera International Airport's 3,200 m Code-4E runway — sized for wide-body jets — completed Phase 1 civil works in December 2025, with calibration flights carried out in early 2026. Cargo operations are expected to begin in the second half of 2026, and passenger service is expected by December 2026 — though that date is not yet officially confirmed.Ashaval, 2026
Tata Electronics × PSMC semiconductor fabUnder constructionTata Electronics, in partnership with PSMC, is building India's first commercial semiconductor fab in Dholera — a ₹91,000 Cr investment with capacity for 50,000 wafers a month, producing 28–110nm analog and logic chips. Construction was roughly halfway complete in 2026, with trial production targeted for December 2026 and more than 20,000 direct jobs expected in Phase 1.Tata Group, 2024
Full build-out (master plan)PlannedAt full build-out — expected in the 2040s — the master plan projects around 20 lakh residents and roughly 8 lakh jobs.Government of Gujarat, 2026· projection

The digest, the snapshots, and the filings land in the community before anywhere else.