Brokers sell plots. We do homework.
This is the intelligence layer behind everything on this site — what we produce, how often, and the current state of the ground. The full output lands in the community first.
AI research digest
Every Dholera development that matters — announcements, filings, credible press — compiled by AI, verified against sources by humans, delivered in plain language. No noise, no forwarded hype.
Satellite progress notes
Construction doesn't lie, and neither does open satellite imagery. We track visible progress on the fab, the airport, the road grid and the activation area — pace, not promises.
Plain-language filings
TP-scheme notifications, development-plan amendments, allotment notices — translated from bureaucratese into what it means for someone who owns (or wants to own) land there.
Infrastructure tracker.
The current, sourced status of every major piece. Statuses mean what they say — planned is a target, operational is open today.
| Asset | Status | The facts | Source |
|---|---|---|---|
| Ahmedabad–Dholera Expressway | Operational | The 109 km Ahmedabad–Dholera Expressway — a four-lane, access-controlled corridor expandable to eight lanes — was inaugurated on 31 March 2026. | Wikipedia, 2026 |
| Activation Area trunk infrastructure | Operational | A 22.5 sq km Activation Area with plug-and-play trunk infrastructure — sanctioned at ₹4,400 Cr by the DMIC Trust — is now over 95% complete, and has already drawn industrial allotments including Tata Power Solar, ReNew, Hitachi Hi-Rel, and Torrent Gas. | GIDB, Government of Gujarat, 2026 |
| Dholera Solar Park (phased) | Operational | Dholera Solar Park carries Ultra-Mega status with a 5 GW target by 2030. Over 1,200 MW was already commissioned by 2025, including Tata Power's 300 MW Phase 1 — online since April 2022 — which uses India's largest single-axis solar tracker system. | Global Energy Monitor, 2026 |
| Dholera International Airport | Under construction | Dholera International Airport's 3,200 m Code-4E runway — sized for wide-body jets — completed Phase 1 civil works in December 2025, with calibration flights carried out in early 2026. Cargo operations are expected to begin in the second half of 2026, and passenger service is expected by December 2026 — though that date is not yet officially confirmed. | Ashaval, 2026 |
| Tata Electronics × PSMC semiconductor fab | Under construction | Tata Electronics, in partnership with PSMC, is building India's first commercial semiconductor fab in Dholera — a ₹91,000 Cr investment with capacity for 50,000 wafers a month, producing 28–110nm analog and logic chips. Construction was roughly halfway complete in 2026, with trial production targeted for December 2026 and more than 20,000 direct jobs expected in Phase 1. | Tata Group, 2024 |
| Full build-out (master plan) | Planned | At full build-out — expected in the 2040s — the master plan projects around 20 lakh residents and roughly 8 lakh jobs. | Government of Gujarat, 2026· projection |
The digest, the snapshots, and the filings land in the community before anywhere else.